ProofNotFluff

Snow removal pricing

Seasonal contract or per push for snow plowing, and what to charge for a driveway and salt?

By ProofNotFluff, run by a finance executive · Worked example from the free snow removal pricing calculator and NOAA daily snowfall at O'Hare. Checked Oct 31, 2026.

The short answer

In your first season, price per push and work the push price out from your own minutes, not a going rate. A seasonal contract only pays if you know how many times you will plow, and a first-year plower does not. Per push, every storm pays; on a seasonal contract, a heavy winter comes out of your pocket.

In the worked example a driveway stop prices at $80 a push. Priced as a season at the middle Chicago winter (6 days with 2 inches or more of new snow at O'Hare), the same stop is a $555 contract. It covers 9 pushes before the season costs more than it pays, and 4 of the last 28 complete winters went past that. Salt is a cost on every visit you spread it: price it into the push, or charge it as its own line, and say which in writing.

New list every Monday. Cancel any time.

The worked example, in four numbers

Price per push
$80
25 minutes on site, $15 of salt, 25% margin
Seasonal contract
$555
6 pushes plus a 15% cushion, $111 a month
Pushes it covers
9
before the season costs more than it pays
Salt in the push
$20
the same push without salt prices at $60

From the free calculator's example inputs: 25 minutes on site for a normal push, 10 minutes of drive from the stop before, 1 person at $40 an hour, a truck and plow at $35 an hour, $15 of salt or ice melt a visit and a 25% margin. A push costs $58.75, so it prices at $80, rounded up to the next $5. A deep storm at 45 minutes costs $83.75 and prices at $115.

The seasonal contract is the push price times the pushes you expect, plus a 15% cushion for a heavy winter, rounded up to the next $5. Here the pushes expected are 6, the O'Hare middle winter with a trigger of 2 inches, so the contract is $555, or $111 a month over 5 months. These are the calculator's example numbers, not a 50 by 15 foot driveway: time your own stop and type your own minutes.

Per push or seasonal, the same stop in past Chicago winters

One push for each day with 2 inches or more of new snow at O'Hare, at the example's $80 a push and $58.75 of cost. The seasonal contract is priced at the middle winter, 6 pushes, and pays $555 however much it snows.

WinterPushesPer push paysPer push profitSeasonal paysSeasonal profit
Fewest (5 winters, latest 2024-25)3$240$63.75$555$378.75
Light winter4$320$85$555$320
Middle winter6$480$127.50$555$202.50
Heavy winter8$640$170$555$85
Most, 2013-1417$1,360$361.25$555-$443.75

Days counted from NOAA's daily snowfall at O'Hare, the last 28 complete winters, 1998-99 to 2025-26 (the free snow season board). Light is the winter one fifth of the way up from the fewest, middle the median, heavy four fifths of the way up. A day of new snow is counted as one push; a long storm can take two visits and a deep one takes longer, so a real winter can cost more than this table shows. Past winters only, not a forecast.

Your trigger decides how often you plow

Days a winter with new snow at or over each trigger at O'Hare, over the same 28 winters. A lower trigger means more pushes, so a seasonal price has to count them.

TriggerLight winterMiddle winterHeavy winterMost in one winter
1 inch8101523 (2013-14)
2 inches46817 (2013-14)
3 inches24512 (2013-14)
6 inches0112 (5 winters)

The board has no 4 inch count; the 3 and 6 inch rows sit either side of the 4 inch trigger in the question. Pick a station and trigger on the snow season board for the Midway counts.

How to set your prices, step by step

  1. Time one stop

    Plow a driveway like the one in the question and time it, walks included, plus the drive from the stop before. Those minutes, at your labor and truck cost an hour, are the cost of a push.

  2. Price per push from that cost

    Divide the cost by one less your margin. In the example, $58.75 of cost at a 25% margin is $80. Price a deep storm from its own, longer minutes: $115 at 45 minutes.

  3. Set the trigger in writing

    The trigger decides how often you go out. At O'Hare, a middle winter had 6 days with 2 inches or more of new snow. Write the trigger into the agreement, and price a lower trigger with more pushes.

  4. Put salt on its own line

    Salt costs you money on every visit you spread it. Either build it into the push, as the example does, or quote it as a separate charge when the customer asks for it. In the example it adds $20 to the push.

  5. Offer a season only with a cap

    If a customer wants one price, count the pushes it covers and write in a push limit, with extra pushes billed at the per push price. The example contract covers 9 pushes; the 2013-14 winter had 17.

Put in your own minutes, truck cost and salt in the free snow removal pricing calculator.

What the thread says

The question was posted Sep 20, 2016 on PlowSite by a first-year residential plower with five to seven interested customers, later saying they were in Connecticut. They planned $40 a push for a 50 by 15 foot driveway at a 4 inch trigger, $50 with the sidewalk, and asked how to price salt and a seasonal rate.

One reply priced about 30 by 16 foot subdivision drives with about 50 feet of walk at $35 a push from 1 to 6 inches, $45 from 6 to 12 and $60 at 12, with deicer included if the customer wants it. It said 15 to 20 pounds of deicer is enough for a drive and that 3 times the cost of materials is a pretty safe rate. Another reply said salt is of course extra, and to base a seasonal price on your average storms plus another 5 to 10 trips. A third said it would never use a 4 inch trigger, 3 inches at most.

Why a seasonal contract is a bet on the winter

A seasonal price pays the same in every winter. At the example's $555, a winter with 4 pushes pays well; the 2013-14 winter, with 17 days of 2 inches or more at O'Hare, would have cost more than the contract paid. Per push, the same stop earns more in a heavy winter and less in a light one, and every visit pays as long as the push price covers its cost.

That is why the thread's advice to add trips on top of the average matters. In 28 winters, 9 had 8 or more pushes and 4 went past the 9 the example contract covers. A cushion, a cap on pushes, or both keep a heavy winter from wiping out the season.

How to charge for salt

Salt is a material you buy, so it belongs in the price on every visit you spread it. Two ways work: put it in the push price, which the example does with $15 of salt raising the push from $60 to $80, or quote it as a separate application the customer asks for.

A separate line is easier to explain and lets a customer skip it. The thread's rule of thumb of 3 times your material cost would charge $45 for $15 of salt; the example's margin method charges $20. Whichever you use, weigh what a drive actually takes rather than guessing in bags.

Per storm pricing

The question also asks about one price per storm. One reply in the thread called it dicey unless the terms are clearly stated. A long storm can take more than one visit, so if you offer it, say how many inches or visits it covers and what happens past that.

Keep the crew busy between storms

If you also clean buildings or windows in Chicago, the Chicago Construction Cleaning Leads list sends every Monday the open projects of $500,000 or more and the builder on each, with the ones near finish marked. $29 a month, cancel any time.

Get the full list: $29 a month

Secure checkout by Gumroad. Cancel any time.

Or see this week's free sample first

Questions

Should I do seasonal contracts or per push in my first year?

Per push, until you know how many times you plow and how long each stop takes. A seasonal price is a bet on the winter. In the example, a $555 contract covers 9 pushes and 4 of the last 28 winters at O'Hare went past that.

How much should I charge to plow a 50 by 15 foot driveway?

Time it, then price from your cost. In the calculator's example, a 25-minute stop with a 10-minute drive, $40 an hour of labor, a $35 an hour truck and $15 of salt prices at $80 a push at a 25% margin. Your own minutes give your own price.

Should salt be included in the push price?

Either works if the customer knows which. Built in, the example's $15 of salt adds $20 to the push. As its own line, the customer can skip it. One reply in the thread includes deicer; another charges it extra.

How many times will I plow in a Chicago winter?

At O'Hare, the middle of the last 28 complete winters had 6 days with 2 inches or more of new snow, a light one 4 and a heavy one 8. The most was 17, in 2013-14. Check the snow season board for your trigger and station.

Related pages

Sources