Free price index tracker
Material Price Changes Since Your Quote
How far 23 materials the trades buy have moved since the month you quoted, from the federal producer price index. 22 of 23 are up from a year ago in the Oct 2026 index. Free, no sign-up.
since Oct 2025
since Oct 2025
next update Dec 15, 2026
BLS producer price indexes, national and Midwest region, not seasonally adjusted, through Oct 2026, retrieved from BLS on Nov 13, 2026.
What your quote is worth now
Pick the material, the month you priced the job and the material cost in your quote. The result moves with the BLS index for that material, the way BLS shows contracts adjusting a price.
Copper wire and cable is up 25.5% from Oct 2025 to Oct 2026. $10,000.00 at the Oct 2025 index is $12,549.98 at the Oct 2026 index.
Oct 2026 is preliminary: BLS can revise it for up to 4 months after it first comes out.
Where prices moved in a year
Change in each price index from Oct 2025 to Oct 2026, largest rise first.
- No. 2 diesel fuel, +115.2%
- Steel mill products, +32.9%
- Copper wire and cable, +25.5%
- Aluminum mill shapes, +23.3%
- Steel pipe and tube, +21.7%
- Plywood, +16.9%
- Paving mixtures and blocks, +7.8%
- Fabricated structural metal, +7.7%
- Lumber, +6.4%
- Construction sand/gravel/crushed stone, +6.1%
- Plumbing fixtures and fittings, +6.0%
- Insulation materials, +4.6%
- Asphalt felts and coatings, +4.4%
- Concrete block and brick, +3.9%
- Plastics pipe, +3.8%
- Prepared paint, +3.8%
- Heating equipment, +3.3%
- Midwest region ready-mix concrete, +3.2%
- Ready-mixed concrete, +2.4%
- Lighting fixtures, +2.3%
- Brick and structural clay tile, +1.3%
- Gypsum products, +0.9%
- Cement, -0.4%
Every material
| Material | Index, Oct 2026 | 1 month | 12 months | Last 12 months |
|---|---|---|---|---|
| Wood | ||||
| LumberFramers, carpenters, deck builders and remodelers | 275.6P | -2.5% | +6.4% | |
| PlywoodFramers, roofers and remodelers (sheathing and subfloor) | 312.4P | +2.4% | +16.9% | |
| Concrete and masonry | ||||
| Ready-mixed concreteConcrete, foundation and flatwork contractors | 394.8P | -0.1% | +2.4% | |
| Midwest region ready-mix concreteConcrete contractors, Illinois included | 187.1P | 0.0% | +3.2% | |
| CementConcrete, masonry and tile contractors | 356.4P | 0.0% | -0.4% | |
| Construction sand/gravel/crushed stoneExcavation, paving, landscaping and concrete contractors | 562.4P | -0.1% | +6.1% | |
| Concrete block and brickMasons and foundation contractors | 411.2P | +0.4% | +3.9% | |
| Brick and structural clay tileMasons and tuckpointers | 273.7P | +0.3% | +1.3% | |
| Paving mixtures and blocksPaving, sealcoating and hardscape contractors | 439.7P | +0.8% | +7.8% | |
| Metals and wire | ||||
| Steel mill productsSteel erectors, fabricators and general contractors | 399.6P | +2.7% | +32.9% | |
| Fabricated structural metalSteel erectors and general contractors | 390.2P | +2.5% | +7.7% | |
| Steel pipe and tubePlumbers, fire sprinkler and mechanical contractors | 462.4P | +7.1% | +21.7% | |
| Aluminum mill shapesSiding, gutter, window and storefront installers | 371.7P | +0.7% | +23.3% | |
| Copper wire and cableElectricians | 610.0P | +0.6% | +25.5% | |
| Roofing, walls and paint | ||||
| Asphalt felts and coatingsRoofers (shingles, felts and roof coatings) | 363.9P | -0.1% | +4.4% | |
| Gypsum productsDrywall, plaster and remodeling contractors | 486.5P | +0.6% | +0.9% | |
| Insulation materialsInsulation, drywall and HVAC contractors | 296.5P | +0.7% | +4.6% | |
| Prepared paintPainters | 449.1P | +0.3% | +3.8% | |
| Plumbing, HVAC and electrical | ||||
| Plastics pipePlumbers and sewer contractors | 178.9P | -1.6% | +3.8% | |
| Plumbing fixtures and fittingsPlumbers and remodelers | 381.1P | 0.0% | +6.0% | |
| Heating equipmentHVAC contractors | 443.8P | +0.1% | +3.3% | |
| Lighting fixturesElectricians | 247.0P | 0.0% | +2.3% | |
| Fuel | ||||
| No. 2 diesel fuelEvery trade that runs trucks, loaders or generators | 643.2P | -4.6% | +115.2% | |
1 month compares Oct 2026 with Sep 2026; 12 months compares Oct 2026 with Oct 2025. Changes come from BLS's index values, rounded once to a tenth of a percent. P marks a preliminary month BLS can still revise.
Read these numbers right
Index numbers, not Chicago prices
Each index tracks what U.S. producers get for that material, across the country, or across the Midwest region for the regional ready-mix concrete index. It shows how far prices moved, not what a Chicago supplier charges you.
The last 4 months can still change
BLS revises each month for up to 4 months after it first comes out. Those months carry a P. Run a quote again after a revision and the result can move a little.
Compare the changes, not the index numbers
Each material has its own starting point, so a lumber index of 276 and a steel mill products index of 400 say nothing about which costs more. The percent changes compare fine.
When it updates
BLS publishes the November 2026 numbers on Dec 15, 2026, and this page is set to update that day.
How this page is made
Every number comes from the U.S. Bureau of Labor Statistics producer price index by commodity, not seasonally adjusted, pulled from BLS's Public Data API every weekday, so a new release or revision usually shows up the same day.
The materials are BLS series for what trade owners commonly buy: wood, concrete and masonry, steel, aluminum, copper wire, roofing, drywall, insulation, paint, pipe, fixtures, heating equipment and diesel. Each series ID and title is BLS's own.
A change is the later index divided by the earlier one, less one, shown as a percent rounded to a tenth. The calculator multiplies your amount by the same ratio, which is how BLS's Producer Price Index (PPI) Guide for Price Adjustment shows a price following an index.
Index values are shown as BLS publishes them. The percent changes and calculator results are ProofNotFluff's arithmetic on those values. They are not a price quote and do not say what any contract allows; your contract does. For questions about an index, check with BLS.
Questions
How do I work out how much a material went up since my quote?
Divide the price index for this month by the index for the month you quoted, then multiply your material cost by that number. Copper wire and cable was 486.071 in Oct 2025 and 610.018 in Oct 2026, so $10,000 of it then is $12,549.98 at the Oct 2026 index, up 25.5%. The calculator on this page does the same math for every material here.
Are these Chicago prices?
No. These are producer price indexes from the U.S. Bureau of Labor Statistics: what U.S. producers get for each material, measured across the country. Ready-mixed concrete is also shown for the Midwest region. Your supplier's price in Chicago can be higher or lower, and can move at a different speed. Use the index to see the size of a move.
Why did a number change after I used it?
BLS revises each month for up to 4 months after it first comes out, as late reports arrive. Months still open to revision carry a P on this page. Right now Jul 2026 to Oct 2026 are preliminary.
Which index should I use for a material I buy?
If your contract names an index, use that one. Each material's page shows its BLS series ID, so anyone can look up the same numbers on bls.gov; for questions about an index, check with BLS.
Are these seasonally adjusted?
No. These are the raw monthly numbers, with no smoothing for the seasons. That is the kind BLS's Producer Price Index (PPI) Guide for Price Adjustment says to use when a price follows an index.
When does this page update?
BLS releases the producer price index once a month. The next release, for Nov 2026, is on Dec 15, 2026, and the page is set to update that day, along with any revisions to the 4 months before it.
Can I download the numbers?
Yes. The CSV on this page has every month since January 2017 for every material, with BLS's series ID and a column that says which months are preliminary. Each material's page has its own CSV too.
Check a quote Download the CSV
More free Chicago data
- Public Way Permit Cost Calculator$50 CDOT usage fee, Class A outside the CBD, 1 to 3 days, before the application feeDumpster, vehicle, closure and opening permits, each line of math shown.
- What a Chicago Crew Costs$17.05 Chicago minimum wage an hour from July 1, 2026, employers with 4 or more employeesPay by trade, public works rates and a crew day calculator.
- Snow Season Board6 plowable days in a middle winter at O'Hare, 2 inch triggerLight and heavy seasons for both stations and four snow depths.